My wife has now declared that there is more Jeep in the scrap pile than there is in the garage. I’m calling this an exaggeration since most of the new panels are in the garage even if they are not attached. But I see her point. Now that I have the final floor pan section
More waiting on parts
In the past week I have continued waiting on parts. A few arrived, and some are delayed more than I thought. The last of the floorpan panels arrived on the 6th estimated delivery date and 4th day of “On Fedex vehicle for delivery”. Seriously, my package made a trip around suburbs 30 miles from me
CJ5 Measurements
This past weekend I either didn’t get much done, or got a lot done depending you how you look at it. Nothing really noticable as I am stuck waiting on parts. In normal times I wouldn’t have time to work on all of the projects on my to-do list, but anything I needed I could
Today’s work
Several years ago I found a “deal” on a pair of Nor/Am wheelhouses, and have had them sitting in the box in my garage ever since. A couple days ago when I was test fitting the side panel I got them out and tried putting the passenger side one in place. It’s junk. The radius
Quarantine project
Since I’m stuck at home it seems like a good idea to drag this out to keep me busy. It’s a the tub from my 1980 Jeep CJ5 project that I’ve been putting off for years. The floors were pretty bad. So they are getting replaced. As are the side panels.